[1]
“A Heuristic Based On Makespan Lower Bounds in Flow Shops with Multiple Processors”, ISER, vol. 5, no. 1, pp. 33–43, Aug. 2017, doi: 10.37266/ISER.2017v5i1.pp33-43.