“A Value Model Approach to Reduce PM Cargo’s Costs for the CH-47F Chinook Helicopter”. 2019. Industrial and Systems Engineering Review 7 (1): 16-23. https://doi.org/10.37266/ISER.2019v7i1.pp16-23.