Analysis of a Vendor Managed Consignment Inventory System with Kan-ban Withdrawals and Payment Delays. (2018). Industrial and Systems Engineering Review, 6(1), 41-61. https://doi.org/10.37266/ISER.2018v6i1.pp41-61