References
Akella, R., Choong, Y., and Gershwin, S. (1984). Performance of hierarchical production scheduling policy. IEEE Transactions on Components, Hybrid, and Manufacturing Technology, CHMT-7(3), 225-240.
Akturk, M. S., and Yilmaz, H. (1996). Scheduling of automated guided vehicles in a decision making hierarchy. International Journal of Production Research, 34(2), 577-591.
Arifin, R., and Egbelu, P. J. (2000). Determination of vehicle requirements in automated guided vehicle systems: a statistical approach. Production Planning and Control, 11(3), 258-270.
Aytug, H., Barua, A., Lawley, M., & Uzsoy, R. (2003). Observations on the interactions among deadlock avoidance policies and dispatching rules in automated manufacturing systems. International Journal of Production Research, 41(1), 81-95.
Blazewicz, J., Eiselt, H. A., Finke, G., Laporte, G., and Weglarz, J. (1991). Scheduling tasks and vehicles in a flexible manufacturing system. The International Journal of Flexible Manufacturing Systems, 4(1), 5-16.
Chandra, J., and Talavage, J. (1991). Intelligent dispatching for flexible manufacturing. The International Journal of Production Research, 29(11), 2259-2278.
Chen, I. J., and Chung, C. H. (1991). Effects of loading and routeing decisions on performance of flexible manufacturing systems. International Journal of Production Research, 29(11), 2209-2225.
Co, H. C., Biermann, J. S., and Chen, S. K. (1990). A methodical approach to the flexible-manufacturing-system batching, loading and tool configuration problems. International Journal of Production Research, 28(12), 2171-2186.
Davis, W. J., and Jones, A. T. (1989). On-line concurrent simulation in production scheduling. Paper presented at the Third ORSA/TIMS Conference on Flexible Manufacturing Systems.
De Koster, R. B. M., Le-Anh, T., and Van der Meer, J. R. (2004). Testing and classifying vehicle dispatching rules in three real-world settings. Journal of Operations Management, 22(4), 369-386.
Denzler, D. R., and Boe, W. J. (1987). Experimental investigation of flexible manufacturing system scheduling decision rules. International Journal of Production Research, 25(7), 979-994.
Egbelu, P. J. (1993). Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing system. International Journal of Production Economics, 29(1), 49-64.
Egbelu, P. J. (1987). The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system. Material Flow, 4(1), 17-32.
Han, M., and McGinnis, L. F. (1989). Flow control in flexible manufacturing: minimization of stockout cost. International Journal of Production Research, 27(4), 701-715.
Ho, Y. C., & Liu, H. C. (2009). The performance of load-selection rules and pickup-dispatching rules for multiple-load AGVs. Journal of Manufacturing Systems, 28(1), 1-10.
Ho, Y. C., Liu, H. C., & Yih, Y. (2012). A multiple-attribute method for concurrently solving the pickup-dispatching problem and the load-selection problem of multiple-load AGVs. Journal of Manufacturing Systems, 31(3), 288-300.
Ishii, N., and Talavage, J. J. (1991). A transient –based real-time scheduling algorithm in FMS. International Journal of Production Research, 29(12), 2501-2520.
Klei, C. M., and Kim, J. (1996). AGV dispatching. International Journal of Production Research, 34(1), 95-110.
Koo, P. H., and Jang, J. (2002). Vehicle travel time models for AGV systems under various dispatching rules. The International Journal of Flexible Manufacturing Systems, 14(3), 249-261.
Kumar, P., Tewari, N. K., and Singh, N. (1990). Joint consideration of grouping and loading problems in a flexible manufacturing system. International Journal of Production Research, 28(7), 1345-1356.
Langevin, A., Lauzon, D., and Riopel, D. (1996). Dispatching, routing, and scheduling of two automated guided vehicles in a flexible manufacturing system. The International Journal of Flexible Manufacturing Systems, 8(3), 247-262.
Lee, J., Choi, R. H., and Khaksar, M. (1990). Evaluation of automated guided vehicle systems by simulation. Computers and Industrial Engineering, 19(1), 318-321.
Lee, S. M., and Jung, H. J. (1989). A multi-objective production planning model in a flexible manufacturing environment. International Journal of Production Research, 27(11), 1981-1992.
Leus, R., & Herroelen, W. (2005). The complexity of machine scheduling for stability with a single disrupted job. Operations Research Letters, 33(2), 151-156.
Mahadevan, B., and Narendran, T. T. (1993). Estimation of number of AGVs for an FMS: an analytical model. The International Journal of Production Research, 31(7), 1655-1670.
Mukhopadhyay, S. K., Maiti, B., and Garg, S. (1991). Heuristic solution to the scheduling problems in flexible manufacturing system. The International Journal of Production Research, 29(10), 2003-2024.
O’Grady, P., and Lee, K. H. (1988). An intelligent cell control system for automated manufacturing. International Journal of Production Research, 26(5), 845-861.
Park, S., Raman, N., & Shaw, M. (1989). Heuristic learning for pattern directed scheduling in a flexible manufacturing system. Paper presented at the Proceedings of the Third ORSA/TIMS Conference on Flexible Manufacturing Systems.
Petrovic, D., & Duenas, A. (2006). A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions. Fuzzy sets and systems, 157(16), 2273-2285.
Qiu, L., Hsu, W. J., Huang, S. Y., and Wang, H. (2002). Scheduling and routing algorithms for AGVs: a survey. International Journal of Production Research, 40(3), 745-760.
Rajotia, S., Shanker, K., and Batra, J. L. (1998). Determining of optimal AGV fleet size for an FMS. International Journal of Production Research, 36(5), 1177-1198.
Ro, I. K., and Kim J. I. (1990). Multi-criteria operational control rules in flexible manufacturing systems (FMSs). International Journal of Production Research, 28(1), 47-63.
Sabuncuoglu, I., and Hommertzheim, D. L. (1992). Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion. International Journal of Production Research, 30(7), 1617-1635.
Sinriech, D., and Tanchoco, J. M. A. (1992). An economic model for determining AGV fleet size. International Journal of Production Research, 30(6), 1255-1268.
Slomp, J., Gaalman, G., & Nawijn, W. (1988). Quasi on-line scheduling procedures for flexible manufacturing systems. The International Journal of Production Research, 26(4), 585-598.
Tanchoco, J. M. A., Egbelu, P. J., and Taghaboni, F. (1987). Determination of the total number of vehicles in an MHU-based material transport system. Material Flow, 4, 33-51.
Tompkins, J.A., White, J.A., Bozer, Y.A., & Tanchoco, J.M.A. (2010). Facilities Planning. Hoboken, NJ: John Wiley & Sons.
Um, I., Cheon, H., & Lee, H. (2009). The simulation design and analysis of a flexible manufacturing system with automated guided vehicle system. Journal of Manufacturing Systems, 28(4), 115-122.
Wu, S. D., and Wysk, R. A. (1989). An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing. International Journal of Production Research, 27(9), 1603-1623.
Zandieh, M., & Adibi, M. A. (2010). Dynamic job shop scheduling using variable neighborhood search. International Journal of Production Research, 48(8), 2449-2458.