Quick jump to page content
  • Main Navigation
  • Main Content
  • Sidebar
ISER
  • Home
  • Current
  • Archives
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Privacy Statement
    • Contact
  • Login
  1. Home
  2. Archives
  3. Vol. 8 No. 1 (2020): Industrial and Systems Engineering Review - GDRKMCC20 Special Issue
  4. Articles

Multi-Year Inland Waterway Investment Model and the Value/Consequence Ratio

Main Article Content

Matthew Robinson
Francisco Lefors
Justin Capp
Grover Laporte
James Schreiner
PDF

DOI:

https://doi.org/10.37266/ISER.2020v8i1.pp2-8

Issue section:

Research

Keywords:

3-Year Predictive Budgeting Model, Value Modeling, Decision Support Interface, Value to Consequence Ratio

Abstract

USACE’s IWR must responsibly manage its work packages through its Operations and Maintenance (O&M) annual budget. IWR has developed several models that use data to inform investment strategies for the prioritization of work packages; however, these strategies are based on old data and not predictive in nature. Because work package ranks significantly change when applying a Value Model and Monte Carlo simulation, this research focuses on the significance of a 3-year predictive budgeting model; a model which is enabled by the National Defense Authorization Act (NDAA, 2020). This research will demonstrate a forward-looking methodology using a Value to Consequence Ratio metric (VCR) for funding work packages through a decision support interface via Microsoft’s Power BI. This paper presents the framework for USACE’s Civil Works Navigation business line and creates the potential for future work to integrate other business lines utilizing System Dynamics.
Abstract 532 | PDF Downloads 2
  • About
  • References
  • Related
  • Citation

Article Sidebar

Authors
Matthew Robinson
Francisco Lefors
Justin Capp
Grover Laporte
James Schreiner
Published
March 6, 2021

Article Details

Issue
Vol. 8 No. 1 (2020): Industrial and Systems Engineering Review - GDRKMCC20 Special Issue
Section
Articles

Authors who publish with this journal agree to the following terms:

  1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
  2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
  3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).

The copyediting stage is intended to improve the flow, clarity, grammar, wording, and formatting of the article. It represents the last chance for the author to make any substantial changes to the text because the next stage is restricted to typos and formatting corrections. The file to be copyedited is in Word or .rtf format and therefore can easily be edited as a word processing document. The set of instructions displayed here proposes two approaches to copyediting. One is based on Microsoft Word's Track Changes feature and requires that the copy editor, editor, and author have access to this program. A second system, which is software independent, has been borrowed, with permission, from the Harvard Educational Review. The journal editor is in a position to modify these instructions, so suggestions can be made to improve the process for this journal.

References

Blair, C., Boardman, J., & Sauser, B., (2007). Communicating strategic intent with systemigrams: Application to the network‐enabled challenge. Systems Engineering, 10(4), 309-322.
Construction Inflation (2020). Construction Analytics. Retrieved from https://edzarenski.com/tag/index/
Durden,S., & Fredericks, J., (2009). Economics Primer: IWR Report 09-R-3. Retrieved from
https://www.iwr.usace.army.mil/portals/70/docs/iwrreports/iwrreport_09-r-3.pdf
Parnell, G. S., Driscoll, P. J., & Henderson, D. L. (Eds.). (2011). Decision making in systems engineering and management (Vol. 81). John Wiley & Sons.
Solberg, A., (2018). System Value Model. NASA. Retrieved from www.nasa.gov/consortium/SystemValueModel
USACE, (2018). Institute for Water Resources. Retrieved from https://www.iwr.usace.army.mil/About/
USACE, (2018). O&M 20/20. Retrieved from https://intranet.usace.army.mil/hq/cecw/Pages/OM2020.aspx
USACE, (2018). Our Mission. Retrieved from https://www.usace.army.mil/
United States Government Accountability Office, (2018). Inland Waterways: Actions Needed to Increase Budget
Transparency and Contracting Efficiency. Retrieved from https://www.gao.gov/assets/700/695255.pdf
Wilby, B., Asberry, J., Griffith-James, J., Houle, J., & Schreiner, J. (2019). Utility to the Nation: An Investment Strategy for our Inland Waterways. Industrial and Systems Engineering Review, 7(1), 9-15.
116th Congress, (2020). National Defense Authorization Act for Fiscal Year 2020. Retrieved from https://www.congress.gov/116/bills/s1790/BILLS-116s1790enr.pdf

How to Cite

Multi-Year Inland Waterway Investment Model and the Value/Consequence Ratio. (2021). Industrial and Systems Engineering Review, 8(1), 2-8. https://doi.org/10.37266/ISER.2020v8i1.pp2-8
  • APA
  • Chicago
  • IEEE
  • MLA
Download Citation
  • Endnote/Zotero/Mendeley (RIS)
  • BibTeX
Crossref
Scopus
Google Scholar
Europe PMC
How to Cite
Multi-Year Inland Waterway Investment Model and the Value/Consequence Ratio. (2021). Industrial and Systems Engineering Review, 8(1), 2-8. https://doi.org/10.37266/ISER.2020v8i1.pp2-8
  • APA
  • Chicago
  • IEEE
  • MLA
  • Download Citation
  • Endnote/Zotero/Mendeley (RIS)
  • BibTeX

Most read articles by the same author(s)

  • James Schreiner, Montrel Jackson, Michael Ruggieri, Christian Sarlitto, John Szalankiewicz, A Predictive and Scalable Capital Investment Risk Model (CIRM) for the Department of Veterans Affairs , Industrial and Systems Engineering Review: Vol. 12 No. 2 (2025): Industrial and Systems Engineering Review - GDRKMCC24 Special Issue
  • Garrett Batt, Madison Kusano, Tavin McMickens, Joel Rubin, James Schreiner, Priority Risk Index: A Novel Approach to Determining Project Health for the United States Corps of Engineers , Industrial and Systems Engineering Review: Vol. 12 No. 2 (2025): Industrial and Systems Engineering Review - GDRKMCC24 Special Issue
<< < 1 2 
Archives About Submissions Contact

ISSN 2329-0188

connect with us
on social media

Modal Header